Wednesday, 30 September 2009

It's a washout!

The last couple of weeks have been extremely wet, which is pretty typical spring weather here. At this stage in the build there's only one job left to do before we can make any more progress, and that's putting in the posts for the veranda. We managed to dig one of the six holes before the rain set in two weekends ago, but when we went up on site last weekend, we found that the trench where we need to dig the holes was flooded. We bailed out as much water as we could, but the ground was far too gloopy to dig. 


 Our newly-installed septic system and water tanks looking the worse for the rain


 Oh dear!

There's been an awful lot more rain this week, with more forecast over the next four days, so we're expecting the flooding to be even worse when we go up to the site this weekend. What we need is at least a week's worth of fine weather to dry everything out before we can do any more work on the build. It's very frustrating, as the chances of going for a week without rain at this time of year are pretty slim. The build could easily be held up for another month.



This is where the veranda posts go


On the positive side, we've now only got another two or three weeks to wait for the yurt, and once that arrives we'll be moving up onto the site. We have to give 21 days' notice on our rental, which we won't do until we've got the yurt, which means we'll have a nice and leisurely three weeks to do the move and work out where the heck we're going to put everything.

No comments: